<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
<title>New Mexico Traffic Conditions</title>
<link>http://nmroads.com"</link>
<description>Traffic incident and event information for all of New Mexico</description>
<language>en-us</language>
<atom:link href="http://nmroads.com/rss.xml" rel="self" type="application/rss+xml" />
<pubDate>Thu, 17 May 2012 01:43:01 -0600</pubDate>
<lastBuildDate>Thu, 17 May 2012 01:43:01 -0600</lastBuildDate>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 14 May 2012 14:58:09 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 180 from mile marker 54 to mile marker 57<br/>Description: The NMDOT will be performing maintenance operations along the shoulders by removing debris and installing fencing between mile marker 54 to 57 in both directions. Motorists are encouraged to use caution near the work zone.<br/>Post Date: Mon May 14 14:58:09 MDT 2012<br/>Update Date: Mon May 14 14:58:09 MDT 2012<br/>Expiration Date: Sat Jun 09 00:00:00 MDT 2012]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">8070c43b87ae50a9d6b125cc6853bc3f</guid>
<geo:lat>33.265117642791445</geo:lat><geo:long>-108.87163526921485</geo:long>
</item>
<item>
<title>Roadwork - Interstate 25 northbound and southbound at mile marker 229</title>
<pubDate>Fri, 04 May 2012 13:20:54 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at mile marker 229<br/>Description: •	Ongoing through Thursday 6/21 from 7am to 10pm  each day (CABQ/ASH) – I_25 both directions from Jefferson to Osuna will have activity in the median. The contractor has restriped and placed barrier wall during this time to restore traffic during median activity for the project. <br/>Post Date: 2012-05-04 13:20:54.097<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: 2012-06-21 22:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">246f3d1fd4a81b732fb532cd81fbf629</guid>
<geo:lat>35.13691711425781</geo:lat><geo:long>-106.60311126708984</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Wed, 03 Aug 2011 15:16:49 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 64 eastbound and westbound from 2.2 miles West of Bloomfield at mile marker 62 to 0.2 miles West of Bloomfield at mile marker 64<br/>Description: Roadwork in Progress: US 64 MP 62 -BloomfieldThe New Mexico Department of Transportation has contracted Sterling Brothers Construction, Inc. of Aztec to rebuild US 64 from milepost 62 to 64 for two miles within the City of Bloomfield .   The project anticipated completion is Summer of 2012.  Contractor typical work hours are from 7:00 AM to 5:00 PM, Monday through Friday, with extended hours and weekends possible as needed.  All work schedules are subject to change.TRAFFIC IMPACTSTwo lanes of traffic in each direction will be maintained at all times with a minimum 11-foot driving lanes.  Oversize loads wider than 10’, must call 505-334-7523Currently building Phase 3 of the project by preparing the south side of US 64 for sub grade, curb & gutter and sidewalk installation and asphalt placement.  Once all the asphalt has been placed, the driving lanes will be shifted to the south, storm drain laterals will be installed and paving operations will be completed.  In the final phase of construction, driving lanes will be shifted to newly built lanes and medians will be installed. Note: Wide loads are restricted through the project. The speed limit is reduced to 35 MPH through the project. For your safety, please stay on established driveways and travel lanes.  Motorists are urged to drive slowly through the work zones and maintain a safe following distance for the safety of other motorists and highway crews.  <br/>Post Date: 2011-08-03 15:16:49.263<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">b4d8655a166aea76c2dae2044cade24d</guid>
<geo:lat>36.71084799948049</geo:lat><geo:long>-108.0080308876737</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 04 Nov 2011 13:00:13 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound from mile marker 176 to 4.2 miles South of BELEN SOUTH exit at mile marker 187<br/>Description: I_25 Paving Project / Mile marker 174.8 to 187, South of Belen to Southern District 3 Boundary (Hamilton /Gibson) 180 work Day Project•	Suspended – pending warmer weather for final paving.•	Ongoing and until further notice (Hamilton Construction)- I_25 both directions from mile marker 174.8 to 187 will have various lane closures in 2 mile increments for roadway rehabilitation. Established lane closures will remain during overnight hours. Use caution and reduce your speed.<br/>Post Date: 2011-11-04 13:00:13.83<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">a5d7d351d7391013d52c8a4de4a75ad3</guid>
<geo:lat>34.49777684465037</geo:lat><geo:long>-106.81138509769809</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 17 Oct 2011 09:11:07 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 70 southbound at mile marker 422<br/>Description: Road construction is underway on US 70, mile post 422.30 to mile post 423.933, from 7:00 am to 5:30 pm Monday thru Friday. Motorists are asked to observe construction signing and watch for personnel working in the area.  Expect completion in May, 2012. Emergency  Contacts: NMDOT  Project Manager Richard Gonzales, 575-626-9875. Pat Garcia Asst. Supervisor, 575-626-9889. Contractor K. Barnett & Sons, Michael Barnes, 575-403-6891.<br/>Post Date: Mon Oct 17 09:11:07 MDT 2011<br/>Update Date: Thu May 10 08:07:50 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">367b0b6b774d86e66ae088dc150626be</guid>
<geo:lat>34.17789077758789</geo:lat><geo:long>-103.35176086425781</geo:long>
</item>
<item>
<title>Roadwork - New Mexico 516 from mile marker 7 to mile marker 13</title>
<pubDate>Wed, 09 May 2012 10:28:25 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 516 from mile marker 7 to mile marker 13<br/>Description: NM 516 MM 7.5 ro MM 13.7 - West of Aztec & US 550 159.9 to 161.2 East of Aztec - Starting April 22 - Four Corners Materials  wil begin Roadway Rehabilitation work.  There is a 10' width restriciton on NM 516. Motorists will encounter a two miles workzone with intermittent lane closures.  Project is anticipated to be completed by mid-July.  Please use caution and obey all traffic control signing.<br/>Post Date: 2012-05-09 10:28:25.007<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">53dd71dbad0d2a3351661065e78dafe2</guid>
<geo:lat>36.816334415756586</geo:lat><geo:long>-108.0602589382924</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Tue, 08 Mar 2011 11:57:44 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 64 from 10.7 miles East of Dulce at mile marker 140 to 29.1 miles East of Dulce at mile marker 148<br/>Description: US 84/64 near Lumberton Intersection- James Hamilton Construction, Inc. is contracted by the New Mexico Department of Transportation to rebuild US64 MM140-148 Broken Butt to Lumberton. Motorists will experience intermittent lane drops with a pilot car operation escort and periodic travel delays up to15 minutes. Heavy equipment will be moving in and out of work zones.  Motorists are advised to allow extra travel time, drive slowly through the work zones and maintain a safe following distance for the safety of other motorists and highway crews. Contractor is working Monday-Saturday 7:00 am.-7:00 p.m.<br/>Post Date: 2011-03-08 11:57:44.997<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">855a1de2fafcb331d5b5ccbfce015fa5</guid>
<geo:lat>36.91630359620253</geo:lat><geo:long>-106.86844608454535</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 05 Mar 2012 08:06:26 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 10 northbound and southbound from 8.9 miles East of NM 418 exit at mile marker 72 to DEMING MIDDLE US 180/NM 11 exit at mile marker 83<br/>Description: Hout Fencing with NMDOT will be installing cable barrier along the median, and traffic will encounter intermittent lane closures. Motorists are encouraged to seek an alternate route.<br/>Post Date: 2012-03-05 08:06:26.07<br/>Update Date: 2012-04-18 14:19:17.757<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">0b0f3cafd1e8b855f725ac02899f5412</guid>
<geo:lat>32.26011763726499</geo:lat><geo:long>-107.84310020150936</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Fri, 30 Mar 2012 12:24:43 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 47 northbound and southbound at mile marker 38<br/>Description: •	Saturday 4/7 through Thursday 5/31 from 9am to 3pm each weekday (Landscape Technologies) – N_M 47 both directions at mile marker 38 (just south of Hard Rock) will have various lane closures for landscaping project.<br/>Post Date: 2012-03-30 12:24:43.03<br/>Update Date: 2012-04-27 15:35:07.657<br/>Expiration Date: 2012-05-31 15:00:00.0]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">6ac6a3f19885d299322d71cf5e003b11</guid>
<geo:lat>34.91182327270508</geo:lat><geo:long>-106.67527770996094</geo:long>
</item>
<item>
<title>Alert - </title>
<pubDate>Fri, 13 Apr 2012 09:53:29 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 126 eastbound and westbound from mile marker 13 to mile marker 25<br/>Description: Alert.  NM 126 mile marker 13-25 (Cuba to Fish Hatchery)  Road is muddy with snow in the shaded areas.  Conditions subject to change quickly.  Please drive with caution and reduce your speed.  This event will be updated as conditions change.  <br/>Post Date: Fri Apr 13 09:53:29 MDT 2012<br/>Update Date: Wed May 16 15:34:30 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Alert</category>
<guid isPermaLink="false">41f0a376abba138d3aa02dd95b3d5e6a</guid>
<geo:lat>35.95094807339361</geo:lat><geo:long>-106.74555655367782</geo:long>
</item>
<item>
<title>Roadwork - US 70 westbound, 35.7 miles East of Hondo at mile marker 301</title>
<pubDate>Wed, 09 May 2012 08:57:16 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 70 westbound, 35.7 miles East of Hondo at mile marker 301<br/>Description: Pavement rehabilitation work is ongoing on US 70/380 between mm 301 and mm 325 in the westbound lanes west of Roswell.  Work consist sof  cold milling of the existing pavement with a new hot mix asphalt overlay. There will be temporary one-lane closure with a 45 mph speed limit in the vicinity of the rehabilitation work.  Work will be conducted bwetween the hours of 7:00 am to 5:00 pm Monday through Friday.  Motorists are asked to observe the posted warning and speed signs and watch for construction personnel and equipment in the vicinity of the work.  NMDOT Project Manager Jeff Anderson 575-637-7815.<br/>Post Date: 2012-05-09 08:57:16.16<br/>Update Date: 2012-05-09 08:57:16.16<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">81d8e0bd1316bd6b59c73725a7063234</guid>
<geo:lat>33.344729932861895</geo:lat><geo:long>-105.04483012517137</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 20 Feb 2012 08:23:36 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 54 eastbound and westbound from 3.1 miles West of TUCUMCARI EAST exit at mile marker 305 to 0.4 miles North of Logan at mile marker 327<br/>Description: Tucumcari, NM:  The New Mexico Department of Transportation District 4 office and Versatile Construction Inc., announce the construction operations on US 54 which is scheduled to begin on Monday, February 20, 2012.  Versatile Construction Inc. will be working Monday thru Friday with the hours of 7:00 am to 5:00 pm.  The project is scheduled for 100 working days and is programmed at $637,400.00.  Project starts at mile marker 305 and ends at mile marker 327, and the construction consists of:  Culvert extensions, minor paving, and permanent signing.  Versatile Construction Inc. will start to establish erosion control measures and remove existing culvert pipe.  The contractor will be utilizing traffic control as all work is on the shoulder of US 54.  Speed will be reduced to 35 mph in the construction zone for the safety of the employees.  Motorists are to use caution and reduce their speed in this area.If you have any questions or concerns feel free to contact Project Manager Dave Gonzales @ (575) 461-4619, or Public Information Officer Kenny Luján @ (505) 617-5900.<br/>Post Date: 2012-02-20 08:23:36.297<br/>Update Date: 2012-05-01 08:17:03.47<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">07eaf9b1ba408634a2097f7e42cc98a3</guid>
<geo:lat>35.26178255421109</geo:lat><geo:long>-103.53912794484727</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 20 Jan 2012 15:36:52 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 40 eastbound and westbound from mile marker 154 to mile marker 155<br/>Description: •	Ongoing through Monday 7/16 from 7am to 3:30pm each weekday (Lee Landscapes.) -  I_40 both directions from Coors to Unser will have activity in the median during landscaping project. Be alert for turning trucks into and out of the work zone.<br/>Post Date: 2012-01-20 15:36:52.943<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: 2012-07-17 01:30:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">233650a266cd5a7fdbe619dd0cc69ff3</guid>
<geo:lat>35.09745104184667</geo:lat><geo:long>-106.72291002536517</geo:long>
</item>
<item>
<title>Construction Closure - </title>
<pubDate>Wed, 16 May 2012 15:53:48 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at mile marker 224<br/>Description: Monday 5/21 and Tuesday 5/22 from 9pm to 5am (AUI/CABQ) – The I_ 25 northbound and southbound off ramps to Lead/Coal will be closed for paving operation. Seek alternate route.<br/>Post Date: Wed May 16 15:53:48 MDT 2012<br/>Update Date: Wed May 16 15:53:48 MDT 2012<br/>Expiration Date: Wed May 23 05:00:00 MDT 2012]]></description>
<category>Construction Closure</category>
<guid isPermaLink="false">d3cb054b05ee68dcfa15d456eb4fc8db</guid>
<geo:lat>35.07469940185547</geo:lat><geo:long>-106.64005279541016</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Fri, 11 May 2012 15:39:26 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 448 northbound and southbound at mile marker 0<br/>Description: •	Monday 5/14 through Thursday 5/17 from 8:30pm to 5:30am each evening (Albuq. Asphalt/Vigil) – N_M 4_48 (Coors) both directions at St. Josephs will have various lane closures for mill and inlay project at intersection. Expect minor delays!<br/>Post Date: Fri May 11 15:39:26 MDT 2012<br/>Update Date: Sat May 12 02:49:14 MDT 2012<br/>Expiration Date: Fri May 18 06:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">b849f3ca5f110982cce5dbfc0907ba81</guid>
<geo:lat>35.127967834472656</geo:lat><geo:long>-106.70157623291016</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Wed, 02 May 2012 15:33:42 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 84 from  at mile marker 161 to 0.6 miles South of US 285 - NM 466 exit at mile marker 162<br/>Description: City of Santa Fe - April 21st, the final phase of tunnel construction will start on the east side of St. Francis Drive with the switching over of traffic onto the newly constructed tunnel on the west side of the highway (weather permitting).  The City of Santa Fe and the New Mexico Department of Transportation, in cooperation with the contractor David Montoya Construction and its traffic control subcontractor, Highway Supply, both of Albuquerque made the decision to use a weekend-switchover to minimize inconvenience to the traveling public.  Come Monday morning, weather permitting, commuters should wake up to a revised traffic pattern north of Zia Road.  Weekend travelers should note that southbound traffic needing to turn east onto Zia Road may be directed to find an alternate route during this switchover.  Saturday shoppers needing access to businesses on Zia Road east of St. Francis Drive are advised in advance to find an alternate route during this traffic switchover. The detour is about 600 feet long between Zia and Siringo roads. Because of the high volume of traffic on St. Francis Drive, six lanes of traffic will be maintained throughout construction— three in each direction — but traffic will be shifted and each of the six lanes will be only 10 feet wide, which is 2-feet less than the standard 12 feet lane most motorists are used to.  The detour will be in place throughout the rest of the construction period which is expected to last through the end of June.  During this time, the speed limit will be reduced from 45 mph to 30 mph. The city suggests that large trucks and other motorists seek alternate routes when possible.  Contact City of Santa Fe: Leroy Pacheco 955-6853<br/>Post Date: 2012-05-02 15:33:42.787<br/>Update Date: 2012-05-02 15:33:42.787<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">7f70854fd296502f8be488a299a67c0a</guid>
<geo:lat>35.64017649144038</geo:lat><geo:long>-105.95622487982767</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 10 May 2012 07:53:26 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25, 100 miles South of T OR C SOUTH exit at mile marker 75<br/>Description: The NMDOT will be performing roadway rehabilitation at exit 75 off of I25 and along the business loop within T or C. Motorists will encounter lane drops, reduction in speed and minor delays during peak hours. Please proceed with caution.<br/>Post Date: Thu May 10 07:53:26 MDT 2012<br/>Update Date: Thu May 10 07:53:26 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">fd2acc889774fb61f353462873ddd9c5</guid>
<geo:lat>33.113250583525044</geo:lat><geo:long>-107.29881995401419</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Sat, 12 May 2012 11:59:24 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 528 northbound and southbound from mile marker 2 to mile marker 4<br/>Description: •	 Thursday 5/17 and Friday 5/18 from 9am to 3pm each day (Viscom/Bernco) – N_M 5_28 (Alameda) from Loretta to 2nd Street will have various lane closures for traffic signal maintenance.<br/>Post Date: Sat May 12 11:59:24 MDT 2012<br/>Update Date: Wed May 16 15:51:02 MDT 2012<br/>Expiration Date: Fri May 18 15:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">900a639088fcb0df78c888daed95a198</guid>
<geo:lat>35.19193109862816</geo:lat><geo:long>-106.62676334050585</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 10 Mar 2011 07:38:07 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 54 northbound and southbound, 14.1 miles West of Carrizozo<br/>Description: New Roadway Construction being done by FNF of New Mexico through the end of June 2012.  This includes installation of new Concrete Box Culverts, Milling, Paving, Installation of 24" Culvert Pipe, new Barbed Wire  Fence, and Concrete Wall Barrier.  Detour will be available.    Traveling public are encouraged to adhere to Construction Signing.   Speed Limit is reduced to 45 MPH and is strictly enforced.   A width Restriction of 12' will be enforced on the Detour from MP 112.7 to MP 114.7 due to Temporary Concrete Barrier on the northbound and southbound shoulders in various locations. Occassionally there will be the assistance of pilot cars when there is one lane closures. The Contractor will work Monday thru Friday from sun up to sun down.  Mark Fisher, FNF Senior Foreman -480-313-0897.  Tom Porter, FNF Traffic Control Supervisor, 575-937-4382, Chuck Brill, NMDOT Project Manager - 575-626-9882.<br/>Post Date: Thu Mar 10 07:38:07 MST 2011<br/>Update Date: Fri May 11 07:17:52 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">4d627b4847043eb8f0fe465f87d0be5d</guid>
<geo:lat>33.53423073919074</geo:lat><geo:long>-106.02106527703542</geo:long>
</item>
<item>
<title>Special Event - Interstate 25 northbound and southbound at mile marker 237 TEST ONLY A TEST</title>
<pubDate>Fri, 04 May 2012 11:00:29 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at mile marker 237 TEST ONLY A TEST<br/>Description: TEST ONLY A TEST<br/>Post Date: 2012-05-04 11:00:29.057<br/>Update Date: 2012-05-06 05:55:27.423<br/>Expiration Date: unknown<br/>]]></description>
<category>Special Event</category>
<guid isPermaLink="false">909438ae2e7e34ee0e7e07031c875d86</guid>
<geo:lat>35.24565505981445</geo:lat><geo:long>-106.5677261352539</geo:long>
</item>
<item>
<title>Alert - </title>
<pubDate>Wed, 16 May 2012 07:56:23 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 532 eastbound and westbound at mile marker 1<br/>Description: NM 532, Ski Run Road to Ski Apache will possibly be closed to traffic from 3:00 PM to dark today while equipment is being transported.  If equipment does not arrive by 3:00 PM today then the road will be closed tomorrow, May 17th from 7:00 AM to 2:00 PM.  If we get more information we will update this post.  (PR)<br/>Post Date: Wed May 16 07:56:23 MDT 2012<br/>Update Date: Wed May 16 07:56:23 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Alert</category>
<guid isPermaLink="false">98b5fa828d81184c43fc11a31905903f</guid>
<geo:lat>33.39960861206055</geo:lat><geo:long>-105.69713592529297</geo:long>
</item>
<item>
<title>Special Event - Interstate 25 northbound and southbound at mile marker 229 TEST ONLY A TEST</title>
<pubDate>Fri, 04 May 2012 11:06:15 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at mile marker 229 TEST ONLY A TEST<br/>Description: TEST ONLY A TEST<br/>Post Date: 2012-05-04 11:06:15.557<br/>Update Date: 2012-05-06 05:54:57.317<br/>Expiration Date: unknown<br/>]]></description>
<category>Special Event</category>
<guid isPermaLink="false">73233d4a101f7a0b0a1ef48726f06676</guid>
<geo:lat>35.13691711425781</geo:lat><geo:long>-106.60311126708984</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 06 Feb 2012 10:01:35 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 70 westbound, 35.7 miles East of Hondo at mile marker 301<br/>Description: Pavement rehabilitation work is ongoing on US 70/380 between MP 301 to MP 325 in the westbound lanes west of Roswell.  Work will consist of guardrail improvements and cold milling of the existing pavement with a new hot mix asphalt overlay.  There will be a temporary one-lane closure with a 45 mph speed limit in the vicinity of the rehabilitation work.  Work will be conducted between the hours of 7:00 am to 5:00 pm, Monday through Friday.  Motorists are asked to observe the posted warning and speed signs and watch for construction personnel and equipment in the vicinity of work.  Anyone with questions may contact Jeff Anderson, NMDOT Project Manager, at (575)637-7815 or Nazarrio Lopez, MSCI at 525-444-6401.<br/>Post Date: 2012-02-06 10:01:35.417<br/>Update Date: 2012-05-08 14:41:34.02<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">86d082c39bda69d50c40d0ee5a12f802</guid>
<geo:lat>33.344730377197266</geo:lat><geo:long>-105.04483032226562</geo:long>
</item>
<item>
<title>Construction Closure - New Mexico 599 northbound and southbound from mile marker 6 to mile marker 7, left 2 lanes closed.</title>
<pubDate>Thu, 19 Apr 2012 17:31:45 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 599 northbound and southbound from mile marker 6 to mile marker 7, left 2 lanes closed.<br/>Description: NM 599 & CR 62 Connector Interchange- Starting Monday April 23 – December 2012 - The cross roads between the frontage roads to NM 599 and County Road 62 will be closed.  The east and west frontage roads on NM 599 will remain open.  Travelers can use County Road (CR) 70 as an alternate route to cross NM 599. CR 70 is 2.3 miles north of CR 62.There will be lane closures on the northbound and southbound lanes of NM 599 between mile post 6 and mile post 7.Travelers can expect minor delays between the hours 7:00 a.m. and 5:30 p.m. Monday through Friday.  There will be a reduced speed to 45 mph in the work zone.  Drivers are asked to watch for construction personnel working the area, observe temporary construction signing, and reduce speed to the posted speed limits. <br/>Post Date: 2012-04-19 17:31:45.96<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: 2012-12-31 12:00:00.0]]></description>
<category>Construction Closure</category>
<guid isPermaLink="false">99cbf59d268949dbcc542cbf34a990a6</guid>
<geo:lat>35.65825423277554</geo:lat><geo:long>-106.03691155864729</geo:long>
</item>
<item>
<title>Closure - </title>
<pubDate>Thu, 17 May 2012 00:56:13 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 40 eastbound and westbound from mile marker 149 to mile marker 153<br/>Description: All Eastbound and Westbound Lanes Closed on I-40 from 98th St. to Atrsico Vista due to a Semi Fire. Interstate will remain closed for several hours. All Eastbound Traffic is being diverted off at Exit 149 (Atrisco Vista) onto Central. All Westbound Traffic is being diverted off at Exit 153 (98th St) onto Central. Expect Delays.<br/>Post Date: Thu May 17 00:56:13 MDT 2012<br/>Update Date: Thu May 17 01:42:53 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Closure</category>
<guid isPermaLink="false">db7ad8ba31cfd2b7234a6234f9f1be3f</guid>
<geo:lat>35.07456057200478</geo:lat><geo:long>-106.76840071135297</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Fri, 11 May 2012 15:36:58 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 528 northbound and southbound from mile marker 9 to mile marker 13<br/>Description: •	Saturday 5/19 and Sunday 5/20 from 7am to 7pm and Monday 5/21 from 9am to 3pm (Mountain States/Loomis) – N_M 5_28 both directions from Northern to Idalia (Rio Rancho) will have various lane closures for paving project. Use caution and reduce your speed through the work zone. Expect minor delays! If closures are required during weekdays the hours will be from 9am to 3pm.<br/>Post Date: Fri May 11 15:36:58 MDT 2012<br/>Update Date: Wed May 16 15:46:18 MDT 2012<br/>Expiration Date: Mon May 21 15:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">c5262ed289d55bd043d539b578ad1a8f</guid>
<geo:lat>35.278167174713644</geo:lat><geo:long>-106.61438455589067</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Wed, 25 Apr 2012 16:10:30 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 10 eastbound and westbound from mile marker 139 to mile marker 144, -lane- lane and left shoulder closed.<br/>Description: A.S.Horner with the NMDOT will begin placement of detours and lane restrictions on I10 and I25 (mm 0-1). The intersection of Cholla and Las Alturas is CLOSED for the next 3 months with detours posted alerting motorists. Law enforcement will be present and double fines will be in affect.<br/>Post Date: 2012-04-25 16:10:30.86<br/>Update Date: 2012-05-02 09:35:33.913<br/>Expiration Date: 2013-01-01 01:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">2ef81533fdda4ea78d2724fe5e076431</guid>
<geo:lat>32.28102447309066</geo:lat><geo:long>-106.77005361147575</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Mon, 14 May 2012 07:58:49 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 180 northbound and southbound from mile marker 8 to mile marker 12<br/>Description: US 180 will be reduced to one lane in both directions from mile marker 8-12 (south of Luna) due to road maintenance work.  All work will be performed from 9am to 3:30pm from 5/14 through 5/17.  Expect 5-10 minute delays.  Please drive with caution, reduce speed and obey all posted traffic signs.  This event will be updated as conditions change.<br/>Post Date: Mon May 14 07:58:49 MDT 2012<br/>Update Date: Wed May 16 15:35:37 MDT 2012<br/>Expiration Date: Thu May 17 15:30:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">1f29ad24ae0223e97bef186ac32e65ff</guid>
<geo:lat>33.78441438941828</geo:lat><geo:long>-108.95308551602596</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 11 May 2012 17:15:04 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 at mile marker 229<br/>Description: Saturday 5/12 at 8pm until Monday 5/14 at 5am (Reiman/Barela) – Montgomery both directions over I_25 will be reduced to one lane for bridge maintenance. EXPECT DELAYS!!!<br/>Post Date: Fri May 11 17:15:04 MDT 2012<br/>Update Date: Fri May 11 17:15:04 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">6958813f6ab3ba47b989683eaf0c0d2a</guid>
<geo:lat>35.13691711425781</geo:lat><geo:long>-106.60311126708984</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 07 Oct 2011 13:59:42 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound, 1.3 miles South of Bernardo at mile marker 174<br/>Description: Bridge construction continues with a 12 foot width restriction in place. Motorists will encounter a reduction in speed and are asked to proceed with caution.<br/>Post Date: 2011-10-07 13:59:42.88<br/>Update Date: 2012-04-18 14:14:20.777<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">6b6e0cf6815aebbb7246e2d08fa224de</guid>
<geo:lat>34.40463638305664</geo:lat><geo:long>-106.84901428222656</geo:long>
</item>
<item>
<title>Alert - </title>
<pubDate>Wed, 16 May 2012 15:56:01 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 419 eastbound and westbound from 100 miles East of Trementina at mile marker 47 to Trementina at mile marker 0<br/>Description: The NMDOT has determined to restrict speed to 20 mph on six (6) timber bridges on NM 419 due to aging and damaged timber elements.  Increased construction in the area on and around NM 419 has caused these bridges to get much heavier use than usual and the bridges are showing areas of light to heavy deterioration and cracking.  NMDOT District 4 bridge crews are working on correcting bridge deficiencies.  Until all these bridges deficiencies are corrected these speed restrictions will remain in place.The listing of bridges with locations is as follows:Bridge No. 5299 at MP 7.17 on NM 419Bridge No. 5968 at MP 8.36 on NM 419Bridge No. 5966 at MP 10.48 on NM 419Bridge No. 5965 at MP 13.06 on NM 419Bridge No. 6257 at MP 17.52 on NM 419Bridge No. 6453 at MP 27.48 on NM 419Also, Bridge No. 6453 on NM 419 was closed on July 14, 2011 due to several cracked and busted girders at MP 17.04.New Mexico Highway 419 runs from Trementina to Mosquero in San Miguel and Harding counties in northeast New Mexico.<br/>Post Date: Wed May 16 15:56:01 MDT 2012<br/>Update Date: Wed May 16 15:56:01 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Alert</category>
<guid isPermaLink="false">f3d2240af22722801c0ba4ec8ecddcad</guid>
<geo:lat>35.68100527366441</geo:lat><geo:long>-104.29292226605764</geo:long>
</item>
<item>
<title>Special Event - </title>
<pubDate>Tue, 15 May 2012 02:33:57 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 southbound at mile marker 267 test only<br/>Description: test only a test<br/>Post Date: Tue May 15 02:33:57 MDT 2012<br/>Update Date: Tue May 15 02:33:57 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Special Event</category>
<guid isPermaLink="false">7da4e8ad769b15517b1c4d023220c58d</guid>
<geo:lat>35.52139663696289</geo:lat><geo:long>-106.1859130859375</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 30 Apr 2012 14:01:26 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 90 from mile marker 42 to mile marker 38<br/>Description: The NMDOT will be performing roadway maintenance where traffic will be reduced to one lane and width restrictions will be in place. Please proceed with caution.<br/>Post Date: Mon Apr 30 14:01:26 MDT 2012<br/>Update Date: Mon May 14 14:10:11 MDT 2012<br/>Expiration Date: Fri Jun 01 01:00:00 MDT 2012]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">296e3c24c0a75c40da9122b4bbfcc499</guid>
<geo:lat>32.74665892319869</geo:lat><geo:long>-108.29141342720204</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Fri, 27 Apr 2012 15:45:57 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 45 southbound from mile marker 11 to mile marker 10<br/>Description: •	REVISED! Ongoing through Friday 5/25 from 9am to 3pm each weekday (Les File Drywall) – N_M 45 (Coors) southbound between mile marker 11 and 10 in the vicinity of Arenal will have the right lane closed for turn lane installation.<br/>Post Date: Fri Apr 27 15:45:57 MDT 2012<br/>Update Date: Wed May 16 15:55:02 MDT 2012<br/>Expiration Date: Fri May 25 15:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">236ac724fdf4dadfdeb02a5a5b4fe473</guid>
<geo:lat>35.05143203038971</geo:lat><geo:long>-106.7072613731158</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 09 Dec 2010 09:35:18 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 54 northbound and southbound from Carrizozo at mile marker 107 to mile marker 112<br/>Description: On Wednesday August 10th FNF Construction, Inc. will commence the rehabilitation of the bridge that spans Cottonwood Creek at Mile Post 112 on US54 between Tularosa and Carrizozo, NM.  The completion of this work requires  a width restriction of 11 feet. Delays should be expected.  The speed limit at the bridge has been reduced to 35 MPH and a bump on the south bound and north bound lane will be experienced.  New Roadway Construction being done by FNF of New Mexico through the end of June 2012.  This includes installation of new Concrete Box Culverts, Milling, Paving, Installation of 24" Culvert Pipe, new Barbed Wire  Fence, and Concrete Wall Barrier.  A width Restriction l be enforced on the Detour from MP 110.0 to MP 112.7 due to Temporary Concrete Barrier on the northbound and southbound shoulders in various locations.    Traveling public are encouraged to adhere to Construction Signing.   Speed Limit is reduced to 45 MPH and is strictly enforced.   Occassionally there will be the assistance of pilot cars when there is one lane closures. The Contractor will work Monday thru Friday from sun up to sun down.  Mark Fisher, FNF foreman -480-313-0897, FNF Traffic Control Supervisor, Tom Porter 575-937-4382  Chuck Brill, NMDOT Project Manager - 575-626-9882.<br/>Post Date: 2010-12-09 09:35:18.247<br/>Update Date: 2012-05-03 07:34:03.873<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">3e05883d8de231f6d6a379f3a66f02ef</guid>
<geo:lat>33.49143207581926</geo:lat><geo:long>-106.05157206408411</geo:long>
</item>
<item>
<title>Roadwork - US 285 northbound and southbound at Carlsbad at mile marker 35, center 2 lanes closed.</title>
<pubDate>Fri, 30 Sep 2011 07:32:24 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 285 northbound and southbound at Carlsbad at mile marker 35, center 2 lanes closed.<br/>Description: Construction continues on Canal Street in Carlsbad. Canal Street from Pompa Street Alameda Street is 4- lane traffic north bound lanes and south bound lanes. One lane closures are being set up during the daytime work hours and open to 4-lane traffic at night. Traffic is open to 4 lane traffic from Green Street to Church Street west bound lanes and east bound lane. WIDTH RESTRICTION of 9' is in effect. NO WIDE LOADS. Closures and postings will change as work progresses north on Canal Street.  Alternative access is provided for Businesses at these locations. Please observe all construction signing and posted speed limits and watch for equipment and personnel working in these areas. Construction is expected to continue through May 2012. Cecil Pendergrass, NMDOT PM - 575.626.9873; Lee Montoya, NMDOT Tech Supv.-575.626.9817; Mason Mitchell - 575.956.5808 James Hamilton Construction Co, Contractor.<br/>Post Date: 2011-09-30 07:32:24.967<br/>Update Date: 2012-05-10 10:29:10.597<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">5b9b6cbad89621a0b6b78c07ee7aac11</guid>
<geo:lat>32.43575958225752</geo:lat><geo:long>-104.23843046092296</geo:long>
</item>
<item>
<title>Special Event - </title>
<pubDate>Fri, 04 May 2012 11:07:41 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at mile marker 254<br/>Description: TEST ONLY A TEST.<br/>Post Date: Fri May 04 11:07:41 MDT 2012<br/>Update Date: Mon May 14 11:29:40 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Special Event</category>
<guid isPermaLink="false">a64bff3182f78d6a0fcb8b3e09b9de13</guid>
<geo:lat>35.43022918701172</geo:lat><geo:long>-106.38479614257812</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Thu, 26 Jan 2012 08:54:56 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 54 from Tularosa at mile marker 79 to mile marker 78<br/>Description: Traffic Signal Installation at the intersection of US54/70 and Higuera Avenue in Tularosa.  This work will include sidewalk and corner ramps construction along the area in front of the Tularosa Village Hall between Higuera Ave. and Bosque Street. Motorists should expect a lane reduction during the hours of 7:00 am to 5:00 pm, Monday through Friday through the Village as the Contractor works on the traffic signal installation and sidewalks.  Motorists are asked to watch for construction personnel and equipment in the area, observe construction signing and obey the posted speed limit in the construction area. This project is expected to be completed by the end of June, 2012. NMDOT Project Manager, Chuck Brill, 575-285-2090 or R.T. Electric Inc., Project Superintendent, Jack Hancock, 575-649-5049.<br/>Post Date: Thu Jan 26 08:54:56 MST 2012<br/>Update Date: Fri May 11 07:17:42 MDT 2012<br/>Expiration Date: Sat Jun 30 01:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">e8fe010938dc3f38b974dc8f893cda24</guid>
<geo:lat>33.06284831249635</geo:lat><geo:long>-106.01505554778466</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Fri, 20 Apr 2012 14:11:54 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 40 westbound from mile marker 172 to mile marker 169<br/>Description: •	Sunday 4/22 through Thursday 5/17 from 9pm to 5am each Sunday through Thursday evening (Hayward Baker/Dodge) – I_40 westbound over Tijeras Arroyo between mile marker 172 and 169 will have various lane closures for bridge approach maintenance. Expect minor delays, reduce your speed and use caution through the work zone.<br/>Post Date: 2012-04-20 14:11:54.857<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: 2012-05-18 05:00:00.0]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">19f93e15cbb9ea867a8403c8b898f45a</guid>
<geo:lat>35.06143093791033</geo:lat><geo:long>-106.44754045817115</geo:long>
</item>
<item>
<title>Alert - US 82 from Cloudcroft to La Luz</title>
<pubDate>Thu, 29 Dec 2011 11:17:36 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 82 from Cloudcroft to La Luz<br/>Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! Steep grades, numerous tight turns and one tunnel. Trucks without retarder brakes and/or longer than 65 feet in length PROHIBITED on this section of US 82.  Consider using an alternative router - US 62/180 or US 70.  This is a PERMANENT ALERT<br/>Post Date: 2011-12-29 11:17:36.563<br/>Update Date: 2012-05-11 07:21:03.944<br/>Expiration Date: unknown<br/>]]></description>
<category>Alert</category>
<guid isPermaLink="false">fd6f94d20eaf3cba477112232600c29b</guid>
<geo:lat>32.949107259807576</geo:lat><geo:long>-105.84727720216966</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 26 Apr 2012 14:03:33 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 70 eastbound and westbound at mile marker 264<br/>Description: There is bridge deck sealing ongoing on US 70/380 from MP 264 to MP 302.  This work consists of repairing the bridge decks and sealing them. Motorists are urged to avoid driving onto the fresh asphalt to prevent the emulsion from sticking to your vehicle.  Additionally, please observe the advance construction signing, obey the posted speed limits and watch for construction personnel and equipment in the vicinity of the work.  For more information, please contact Jeff Anderson, NMDOT Project Manager, at (575)637-7811 or (575)626-4857 or Leroy Molina, Qualcon at 505-331-1650<br/>Post Date: 2012-04-26 14:03:33.363<br/>Update Date: 2012-05-08 14:41:46.333<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">c6e337f529996a64acf6686f79bfa166</guid>
<geo:lat>33.335655212402344</geo:lat><geo:long>-105.58114624023438</geo:long>
</item>
<item>
<title>Construction Closure - Interstate 25 at mile marker 282</title>
<pubDate>Sun, 29 Apr 2012 19:09:53 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 at mile marker 282<br/>Description: I-25/St. Francis Bridge Rehabilitation - Starting Thursday, May 3rd, the I-25 northbound off-ramp to US 84/285 (St. Francis Drive) will require complete closure.  This work is expected to be complete late summer 2012.  Alternative routes and traffic restriction for this closure are as follows: I-25 Northbound Off-ramp Closure Alternate Routes:•	NM 599 - Santa Fe Relief Route•	Cerrillos Road •	Old Pecos TrailTraffic Restrictions Starting Week of April 30th:•	The southbound traffic on St. Francis Drive will be switched to the northbound lanes on St. Francis Drive.  Motorists will be traveling on one lane in each direction.  •	The southbound I-25 off-ramp to Rabbit Road will be closed. The southbound traffic to Rabbit Road will be detoured at Old Pecos Trail.•	The northbound I-25 on-ramp at Southbound St. Francis Drive will be closed. Northbound I-25 traffic at southbound St. Francis will be detoured onto Rabbit Road. Additional Alternate Routes include:o	St. Michael’s Driveo	Old Pecos Trailo	Cerrillos RoadDrivers are asked to plan their drive time accordingly, expect delays, watch for construction personnel working the area, observe temporary construction signing, and reduce speed to the posted speed limits. Questions can be directed to Simon Sena with the New Mexico Department of Transportation Project Office, at (505) 980-8780 or Rosanne Rodriguez, Public Information Officer for the New Mexico Department of Transportation District Five, at (505) 476-4205. ###<br/>Post Date: 2012-04-29 19:09:53.077<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: 2012-06-26 12:00:00.0]]></description>
<category>Construction Closure</category>
<guid isPermaLink="false">d9d9ba5f8b3dafd73a71029bdb9d2f51</guid>
<geo:lat>35.631473541259766</geo:lat><geo:long>-105.96452331542969</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 30 Apr 2012 09:02:04 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 53 eastbound and westbound from mile marker 57 to mile marker 77<br/>Description: Roadwork on NM 53, mile marker 57-77 (west of San Rafael).  Traffic reduced to one lane in both directions, speed reduced to 45 mph.  All work will be performed from 8am to 5:30pm.  Please drive with caution, reduce speed and obey all posted traffic signs.  This event will be updated as conditions change.<br/>Post Date: Mon Apr 30 09:02:04 MDT 2012<br/>Update Date: Wed May 16 15:35:21 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">6daadd4cf74ecba4a5337af70c1c47ec</guid>
<geo:lat>34.98709835327857</geo:lat><geo:long>-108.02423649539922</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 30 Apr 2012 14:09:02 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 61 from mile marker 6 to mile marker 14<br/>Description: The NMDOT will be performing maintenance operations with chip sealing of the roadway. Motorists are encouraged to proceed with caution due to loose gravel and no center line present. A pilot vehicle will be assisting which will have minimal delays in traffic. Please use caution.<br/>Post Date: 2012-04-30 14:09:02.657<br/>Update Date: 2012-04-30 14:09:02.657<br/>Expiration Date: 2012-06-01 00:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">0fd368ee7fb7193bab903e2e5151e07c</guid>
<geo:lat>32.61239179184249</geo:lat><geo:long>-107.88403642900668</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Tue, 21 Feb 2012 07:44:21 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 54 northbound and southbound from mile marker 81 to mile marker 82<br/>Description: During the Reconstruction of the Overpass on US 54MP 81.7, a Detour will be built to the south east of the Overpass from US 54 over to Railroad Avenue beginning May 14, 2012.  During the Construction of the Detour, Railroad Avenue from US 54 to Derbyshire will be closed to traffic.  Only those individuals living between Derbyshire Road and US 54 will be allowed access.Other residents in the area can find access from Derbyshire Road South to Tulie Gate Road or from Derbyshire west to Hurshel White Ave, North to Schoeller Place Road and East back to US 54 while the Detour is under construction. This area will be closed from   May 14, 2012  thru June 18, 2012.   Speed Limit reduced to 35MPH thru the work zone.NMDOT Project Manager is Chuck Brill- 575-626-9882. La Calerita Construction Supervisor is Mike Powley - 575-430-0852.<br/>Post Date: Tue Feb 21 07:44:21 MST 2012<br/>Update Date: Fri May 11 07:17:30 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">ccce12900755eb9546ff8593317a0922</guid>
<geo:lat>33.10344221457318</geo:lat><geo:long>-106.04140313506788</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 18 Aug 2011 10:01:12 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 64 eastbound and westbound from 25.6 miles East of US 64 exit at mile marker 359 to mile marker 375<br/>Description: The NMDOT and Kirkland Construction announce that road construction is ongoing on US 64/87 from mile marker 359 to 375. Construction activities can be expected at the following locations:  Haul trucks and machinery crossing at the following mile markers 363, 373, 375. Be especially cautious at these locations beginning May 29, 2012 as paving operations will resume.  Mile marker 359 to 361 bridge construction is ongoing as crews continue to place concrete and set beams on the existing two lane highway.. Traffic is detoured transitioning onto new lanes at mile markers 359.5 and 362.5.  Please be advised that in addition to the specific noted locations, construction activities can be anticipated throughout the work zone from mile marker 359 to 375.  The NMDOT advises traveling motorists and the general public to use extreme caution and be aware of heavy equipment and concrete trucks crossing the roadway during daylight hours and expect reduced speeds as they are posted through work zones. Please pay close attention to construction work zone signs and obey speed limits as double fines are strictly enforced throughout the project limits. The NMDOT and Kirkland Construction are putting forth their best efforts to ensure a safe passage through the project. We ask that the same courtesy be given to construction workers by slowing down when workers are present. Don’t forget to Buckle Up! For any questions or concerns contact Johnny Chavez, Project Manager, NMDOT at (575) 445-9553 or cell phone (575) 643-5340<br/>Post Date: Thu Aug 18 10:01:12 MDT 2011<br/>Update Date: Wed May 16 15:40:53 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">f42bc895b605d41e351262e599e37673</guid>
<geo:lat>36.77415870037458</geo:lat><geo:long>-104.16246892049782</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Tue, 20 Mar 2012 14:51:40 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 40 westbound from mile marker 16 to mile marker 18<br/>Description: Lane closure. I-40 mm 16-18( Gallup West Interchange) Westbound lanes closed. Traffic will detour to Eastbound lanes, there will be one lane of traffic traveling in each direction. Due to road maintenance.  March 21 ,2012 thru July 12, 2012.  Please drive with caution, reduce your speed and obey all posted traffic signs. This event will be update as conditions change. <br/>Post Date: Tue Mar 20 14:51:40 MDT 2012<br/>Update Date: Wed May 16 15:34:38 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">4cc2726943f35a6c596fb8dd82d7baa4</guid>
<geo:lat>35.51060755112092</geo:lat><geo:long>-108.82579424026622</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 17 Feb 2012 16:08:04 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 6 eastbound and westbound from mile marker 33 to mile marker 35<br/>Description: N_M 6 Curb & Gutter w/Sidewalk / from Los Cerritos to Los Lentes, (G Sandoval Const. /Justin Gibson PM) Completion date 5.4.12  •	Monday 2/20 and until further notice – N_M 6 from Los Cerritos to Los Lentes will have activity on the shoulders with occasional right lane closures for curb & gutter/sidewalk installation. Use caution and reduce your speed through the work zone.<br/>Post Date: 2012-02-17 16:08:04.24<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">0cd7508349705b964ceb7e584c62c16a</guid>
<geo:lat>34.81057687068123</geo:lat><geo:long>-106.74104701095153</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Tue, 14 Jun 2011 09:44:12 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 54 northbound and southbound from 7.7 miles South of Corona at mile marker 163 to mile marker 175<br/>Description: New Roadway Construction is underway.  A 10 foot WIDTH RESTRICTION and an 80 foot LENGTH RESTRICTION is now in place. Oversize loads should seek an alternate route. Motorists are asked to be aware of Construction Personnel working in the area and to obey posted construction speed limits and signing. Construction is expected to be completed in the Fall of 2012. NMDOT Project Manager, Robert Thomas, 575-626-9272. Contractor - James Hamilton Construction Company-575-388-1546.<br/>Post Date: 2011-06-14 09:44:12.563<br/>Update Date: 2012-05-11 07:21:03.944<br/>Expiration Date: 2012-10-01 00:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">308052247f7bd9611657c34750c0c5db</guid>
<geo:lat>34.239908149155355</geo:lat><geo:long>-105.59942303212824</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 26 Mar 2012 17:07:39 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 84 at mile marker 190<br/>Description: The New Mexico Department of Transportation (NMDOT) bridge lighting installation on Onate Bridge located in the City of Espanola will start work  March 27th. The contractor will begin preparation work reducing the Onate Street bridge roadway to one lane.  Motorists will encounter a one lane closure with a flagging operation on March 27th through April 13th from 9:00 am until 4:00pm. <br/>Post Date: 2012-03-26 17:07:39.043<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">b8f8ec0737dc477d3284978a1a4612c3</guid>
<geo:lat>35.99888229370117</geo:lat><geo:long>-106.08521270751953</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 27 Apr 2012 15:36:52 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 337 northbound and southbound from mile marker 26 to mile marker 29<br/>Description: •	Monday 4/30 through Friday 5/18 from 8:30am to 4:30pm each Monday through Saturday (Cutler/Heater Scarification with overlay) – N_M 3_37 from mile marker 26 to 29 (from N_M 3_33 south for 3 miles) will be reduced to one direction only during paving project. Flaggers and a pilot car will be onsite to guide traffic through the work zone. Expect minor delays!!<br/>Post Date: 2012-04-27 15:36:52.017<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: 2012-05-18 17:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">b9dfdb2e951866f8452bde665d7a8723</guid>
<geo:lat>35.056781846391324</geo:lat><geo:long>-106.37987036781843</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 26 Apr 2012 14:07:11 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 285 at mile marker 105<br/>Description: Cutler Repave is working on US 285, on the Relief Route in Roswell. This work will consist of putting down some Open Graded Friction Course overlay. During this project travelers can expect one-lane closures in both directions.  Motorists are asked to watch for construction personnel working in the area, and reduce speed while work is taking place. Any concerns regarding this project you may contact Jeff Anderson, NMDOT Project Manager, at (575) 637-7811.<br/>Post Date: 2012-04-26 14:07:11.367<br/>Update Date: 2012-05-08 14:41:34.02<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">57802c89f0e055000e6176bfba3458e3</guid>
<geo:lat>33.3310661315918</geo:lat><geo:long>-104.50514221191406</geo:long>
</item>
<item>
<title>Roadwork - Interstate 40 eastbound at mile marker 165</title>
<pubDate>Fri, 27 Apr 2012 15:47:12 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 40 eastbound at mile marker 165<br/>Description: •	Monday 4/30 through Thursday 5/31 from 9am to 3pm each weekday (Mountain States) – The I_40 eastbound off ramp to Eubank Southbound will be reduced to one turn lane during curb and gutter installation on Eubank.<br/>Post Date: 2012-04-27 15:47:12.433<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: 2012-05-31 15:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">a197446059df42b09bc04b171d226beb</guid>
<geo:lat>35.08440017700195</geo:lat><geo:long>-106.53620910644531</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Sat, 12 May 2012 12:13:09 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 304 from Arroyo Vista Circle to Upper Dairy Rd.<br/>Description: Thursday 5/17 through Friday 5/25 from 8am to 4pm each Monday through Saturday   – NM 304 from mile marker 14.1 to 16.5 (Arroyo Vista Circle to Upper Dairy Rd.) will be reduced to one lane only with a pilot car to move traffic through the work zone. This a pavement resurfacing project. Expect minor delays!<br/>Post Date: Sat May 12 12:13:09 MDT 2012<br/>Update Date: Sat May 12 12:13:09 MDT 2012<br/>Expiration Date: Fri May 25 23:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">2b9a65b3b8477073819fe6fc729c5e82</guid>
<geo:lat>34.54229484492155</geo:lat><geo:long>-106.75770177631911</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Thu, 30 Jun 2011 10:18:12 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 64 northbound and southbound from 4.4 miles South at mile marker 281 to 10 miles North at mile marker 284<br/>Description: Eagle Nest, NM:  The New Mexico Department of Transportation District 4 office and Northern Mountain Constructors Inc., announce the beginning of construction operations for the week of July 5th through July 2012.  Construction hours will be Monday thru Saturday from 6:45 am to 6:00 pm.  The starting mile marker is 281.8 and the end mile marker is 285.The project will consist of the following:  ROADWAY RECONSTRUCTION, Pavement Sections (Flexible), Roadway Rehabilitation, Cold Milling w/overlay (Flexible), Earthwork (Borrow, Sub-excavation), Metal Barrier Installation, Structures (Culvert Extensions), Erosion Control Measures, Traffic Control (Phasing), Permanent Signing and Miscellaneous Construction.New Mexico 64 will be reduced to one lane traffic due to construction from Mile Marker 281.8 10 miles North of Agua Fria to Mile Marker 284  1.5 miles South of Eagle Nest, beginning on July 5, 2011. Traffic may be detoured down to one lane and escorted thru project by pilot car operation during Construction hours. After Construction hours both lanes will be open to the public at posted speed limits.   the project started in July and will go on until winter suspension which will start the later part of November.  Work will resume in teh spring. Remember, seat belts save lives.  Buckle up and drive safely!Questions, Comments or Concerns, please contact Anthony Martinez, Project Manager at 505-454-3690 or Kenny Luján District Four Public Information Officer at 617-5900<br/>Post Date: 2011-06-30 10:18:12.357<br/>Update Date: 2012-05-01 08:17:03.47<br/>Expiration Date: 2012-08-01 01:00:00.0]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">0dbe768333f2e4af8aeabf663fef9c9d</guid>
<geo:lat>36.51682341884039</geo:lat><geo:long>-105.27647868748727</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Sat, 12 May 2012 12:19:08 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at COMANCHE exit<br/>Description: Sunday 5/13 through Tuesday 6/5 from 8pm to 5am each Sunday through Thursday evening (Hayward Baker/Dodge) – I 25 both directions at Comanche will have various lane closures for bridge maintenance.<br/>Post Date: Sat May 12 12:19:08 MDT 2012<br/>Update Date: Sat May 12 12:19:08 MDT 2012<br/>Expiration Date: Tue Jun 05 23:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">e6e877a351888c9e3f4f48cc216bcfe1</guid>
<geo:lat>35.123815999665744</geo:lat><geo:long>-106.6218675222074</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Sat, 12 May 2012 12:23:18 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 southbound from PASEO DEL NORTE exit to COMANCHE exit, left lane closed.<br/>Description: Monday 5/14 through Thursday 5/17 from 9pm to 5am each evening (SanBar) – I 25 southbound from Paseo Del Norte to Comanche will have the left lane closed for overhead sign work.<br/>Post Date: Sat May 12 12:23:18 MDT 2012<br/>Update Date: Sat May 12 12:23:18 MDT 2012<br/>Expiration Date: Thu May 17 23:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">d08f0a58629bdfadd9df713e873dfff3</guid>
<geo:lat>35.14111181751509</geo:lat><geo:long>-106.59580739581509</geo:long>
</item>
<item>
<title>Roadwork - Interstate 10 eastbound and westbound from 0.8 miles West of NM 292 exit at mile marker 138 to 1.7 miles East of NM 28/MESILLA exit at mile marker 141</title>
<pubDate>Tue, 21 Feb 2012 16:29:51 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 10 eastbound and westbound from 0.8 miles West of NM 292 exit at mile marker 138 to 1.7 miles East of NM 28/MESILLA exit at mile marker 141<br/>Description: The NMDOT with El Terrero Construction has traffic shifted over to the westbound lanes with the eastbound on ramp CLOSED. Alternate routes will be Amador and Avenida de Mesilla. Please proceed with caution.<br/>Post Date: 2012-02-21 16:29:51.143<br/>Update Date: 2012-05-09 13:52:56.8<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">5311538e9c7bdffe8b93e708e941b238</guid>
<geo:lat>32.294188939614145</geo:lat><geo:long>-106.79982377999147</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 16 Mar 2012 09:37:48 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 68 from mile marker 20 to mile marker 21<br/>Description: NM 68 - Espanola to Taos area - New Mexico Department of Transportation has begun construction operations.  Traffic has been placed on two-10' lanes and shifted to the east bound lane.  Starting in April traffic will be switched over to two -11' lanes while the east side is being built.  Please use caution as construction workers will be working in the area and obey all traffic control signing.<br/>Post Date: 2012-03-16 09:37:48.537<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">4cc671ada82deb3310d454c46ed3a94f</guid>
<geo:lat>36.2112491679998</geo:lat><geo:long>-105.91271048746492</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Fri, 17 Feb 2012 16:06:39 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 40 eastbound and westbound from mile marker 140 to mile marker 146<br/>Description: I_40 Reconstruction Project / Mile marker 140 to 146, From Rio Puerco east approx. 6 miles (Mountain States Constructors /Tim Chavez PM) Completion date 10.24.12  •	Monday 2/27 and until further notice – I_40 eastbound from mile marker 143 to 145 will have the left lane closed to set barrier wall and mill roadway.•	Ongoing and until further notice- I_40 westbound from mile marker 146 to 140 will be reduced to one lane during project.<br/>Post Date: 2012-02-17 16:06:39.56<br/>Update Date: 2012-05-11 15:10:58.702<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">714dea2bb9b4f32cd950fa6bac81d088</guid>
<geo:lat>35.04209750888273</geo:lat><geo:long>-106.90114476088732</geo:long>
</item>
<item>
<title>Special Event - Interstate 25 northbound and southbound at mile marker 246 TEST ONLY A TEST</title>
<pubDate>Fri, 04 May 2012 11:07:00 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 northbound and southbound at mile marker 246 TEST ONLY A TEST<br/>Description: TEST ONLY A TEST<br/>Post Date: 2012-05-04 11:07:00.043<br/>Update Date: 2012-05-06 05:55:45.81<br/>Expiration Date: unknown<br/>]]></description>
<category>Special Event</category>
<guid isPermaLink="false">208ada03c1fbdd0aa1255a8729080336</guid>
<geo:lat>35.35893249511719</geo:lat><geo:long>-106.493896484375</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Tue, 14 Feb 2012 09:26:39 -0700</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 65 northbound and southbound from 1 mile North of Las Vegas at mile marker 1 to 4.3 miles North of Las Vegas<br/>Description: Las Vegas, NM:  The New Mexico Department of Transportation District 4 office and Star Paving, announce the construction operations on NM 65 which has began on Wednesday, February 18, 2012.  Star Paving will be working Monday thru Thursday with the hours of 7:00 am to 5:00 pm.  The project is scheduled for 90 days and is programmed at $805,743.50.  Project starts at mile marker 0.98 and ends at 1.626, and the construction consist of: safety, minor paving, earthwork, curb and gutter w/sidewalk, erosion control measures, traffic control, permanent signing and miscellaneous construction.Star Paving has started to remove curb and gutter and work will begin on the West side of NM 65 and go from South to North.  The contractor will be utilizing traffic control as all work is on the shoulder of NM 65.  Speed will be reduced to 35 mph in the construction zone for the safety of the employees.  Motorists are to use caution and reduce their speed in this area.If you have any questions or concerns feel free to contact Project Manager Anthony Martinez @ (505) 454-3690, or Public Information Officer Kenny Luján @ (505) 617-5900.<br/>Post Date: 2012-02-14 09:26:39.743<br/>Update Date: 2012-05-01 08:17:03.47<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">fea6fe7262ea564a74117f4e16cc7a51</guid>
<geo:lat>35.61567942721119</geo:lat><geo:long>-105.24786734568805</geo:long>
</item>
<item>
<title>Construction Closure - </title>
<pubDate>Mon, 22 Aug 2011 13:33:04 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 64 eastbound and westbound at mile marker 242<br/>Description: Taos - US64 MM 242 - Wednesday May 16:  The Rio Grande Gorge Bridge will be opened tonight Wednesday May 16.  Motorists will encounter one lane closure with temporary signals. Thursday May 17 and Friday May 18:   The Rio Grande Gorge Bridge will be closed CLOSED at night in both directions from 7 pm until 7 am the next morning.  Motorists are urged to plan their drive time accordingly and to seek an alternate route.  The Rio Grande Gorge Bridge Night Closure work will be completed May 19 and the Bridge will be opened May 20.  <br/>Post Date: Mon Aug 22 13:33:04 MDT 2011<br/>Update Date: Wed May 16 16:51:09 MDT 2012<br/>Expiration Date: Mon May 21 00:00:00 MDT 2012]]></description>
<category>Construction Closure</category>
<guid isPermaLink="false">c4e57b3de7e61e4d1c9f726f143d2ab9</guid>
<geo:lat>36.478271484375</geo:lat><geo:long>-105.74445343017578</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Tue, 15 May 2012 13:49:09 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 70 northbound and southbound, 2.4 miles West of Portales at mile marker 421<br/>Description: Road construction will be  underway on May 17, 2012 on US 70, mile post 421.60 to mile post 423.330, from 6:00 am to 6:00 pm Monday thru Friday. Work will begin at the intersection of  S. Ave K/Second St to the intersection S. Ave I/ Second St..  Motorists can expect one lane closure in this area and are asked to observe construction signing and watch for personnel working in the area.  Expected completion is August , 2013. Emergency  Contacts: NMDOT  Project Manager Richard Gonzales, 575-626-9875. Pat Garcia Asst. Supervisor, 575-626-9889. Contractor Constructors Inc. Jon Franklin Superintendent,  575-706-7310, John Guldemann, 505-397-4102 <br/>Post Date: Tue May 15 13:49:09 MDT 2012<br/>Update Date: Tue May 15 14:56:41 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">59e075821a55150e492aba9fe53419e6</guid>
<geo:lat>34.16830331787806</geo:lat><geo:long>-103.36481884711672</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Wed, 02 May 2012 15:33:42 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: US 84 from  at mile marker 161 to 0.6 miles South of US 285 - NM 466 exit at mile marker 162<br/>Description: City of Santa Fe - April 21st, the final phase of tunnel construction will start on the east side of St. Francis Drive with the switching over of traffic onto the newly constructed tunnel on the west side of the highway (weather permitting).  The City of Santa Fe and the New Mexico Department of Transportation, in cooperation with the contractor David Montoya Construction and its traffic control subcontractor, Highway Supply, both of Albuquerque made the decision to use a weekend-switchover to minimize inconvenience to the traveling public.  Come Monday morning, weather permitting, commuters should wake up to a revised traffic pattern north of Zia Road.  Weekend travelers should note that southbound traffic needing to turn east onto Zia Road may be directed to find an alternate route during this switchover.  Saturday shoppers needing access to businesses on Zia Road east of St. Francis Drive are advised in advance to find an alternate route during this traffic switchover. The detour is about 600 feet long between Zia and Siringo roads. Because of the high volume of traffic on St. Francis Drive, six lanes of traffic will be maintained throughout construction— three in each direction — but traffic will be shifted and each of the six lanes will be only 10 feet wide, which is 2-feet less than the standard 12 feet lane most motorists are used to.  The detour will be in place throughout the rest of the construction period which is expected to last through the end of June.  During this time, the speed limit will be reduced from 45 mph to 30 mph. The city suggests that large trucks and other motorists seek alternate routes when possible.  Contact City of Santa Fe: Leroy Pacheco 955-6853<br/>Post Date: 2012-05-02 15:33:42.787<br/>Update Date: 2012-05-15 11:04:26.325<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">c5c091bd8afade74d81bce2ede632e65</guid>
<geo:lat>35.64017649144038</geo:lat><geo:long>-105.95622487982767</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Wed, 16 May 2012 15:52:36 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 at mile marker 228<br/>Description: •	Saturday 5/19 at 8pm until Monday 5/21 at 5am (Reiman/Barela) – Montgomery both directions over I_25 will be reduced to one lane for bridge maintenance. EXPECT DELAYS!!!<br/>Post Date: Wed May 16 15:52:36 MDT 2012<br/>Update Date: Wed May 16 15:52:36 MDT 2012<br/>Expiration Date: Mon May 21 05:00:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">b0d113bf0f88a2a277987cc0579eeb1d</guid>
<geo:lat>35.12831115722656</geo:lat><geo:long>-106.61717987060547</geo:long>
</item>
<item>
<title>Roadwork - </title>
<pubDate>Mon, 30 Apr 2012 12:11:46 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 213 from mile marker 2 to mile marker 3<br/>Description: The NMDOT with Smith and Aguirre will have traffic control posted at NM404 and NM 213 as work continues along the shoulders with the construction of the round about and installation of lighing, and drainage structures. please proceed with caution.<br/>Post Date: 2012-04-30 12:11:46.893<br/>Update Date: 2012-05-02 09:52:57.007<br/>Expiration Date: unknown<br/>]]></description>
<category>Roadwork</category>
<guid isPermaLink="false">be6657baf715fe522b1ebd15e275ed76</guid>
<geo:lat>32.032996802517474</geo:lat><geo:long>-106.4618326543415</geo:long>
</item>
<item>
<title>Lane Closure - </title>
<pubDate>Wed, 16 May 2012 08:12:39 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: New Mexico 124 eastbound and westbound from mile marker 22 to mile marker 25<br/>Description: Alternating lane closures in both directions on NM 124, mile marker 22.5-25 (Laguna) due to road maintenance work.  Watch for flag personnel.   All work will be performed from 8am to 3:30pm ending on Friday, 5/18.  Please drive with caution, reduce speed and obey all posted traffic signs.  This event will be updated as conditions change.<br/>Post Date: Wed May 16 08:12:39 MDT 2012<br/>Update Date: Wed May 16 15:35:15 MDT 2012<br/>Expiration Date: Fri May 18 15:30:00 MDT 2012]]></description>
<category>Lane Closure</category>
<guid isPermaLink="false">d2633626462221ca4a7962c3d599f467</guid>
<geo:lat>35.04727878726686</geo:lat><geo:long>-107.40639320928749</geo:long>
</item>
<item>
<title>Special Event - </title>
<pubDate>Sun, 13 May 2012 09:56:30 -0600</pubDate>
<link>http://nmroads.com"</link>
<description><![CDATA[Title: Interstate 25 at mile marker 433  test only a test<br/>Description: TEST Only a Test<br/>Post Date: Sun May 13 09:56:30 MDT 2012<br/>Update Date: Mon May 14 08:32:34 MDT 2012<br/>Expiration Date: unknown<br/>]]></description>
<category>Special Event</category>
<guid isPermaLink="false">fbeff0bc1e68b6b96f5cdd0e2e4e9438</guid>
<geo:lat>36.631507873535156</geo:lat><geo:long>-104.50445556640625</geo:long>
</item>
</channel>
</rss>

